Implementation of SMED Methodology to Reduce the Setup Time in a SMT Production Line

Loading...
Thumbnail Image

Date

Journal Title

Journal ISSN

Volume Title

Publisher

Instituto de Tecnologia e Educação Galileo da Amazônia

Abstract

The overall objective is to implement the Single Minute Exchange of Die (SMED) methodology to reduce the setup time (model change) in an electronics factory in Brazil. The research was carried out at a company in the electronics segment, located in the Industrial Pole of Manaus (PIM). Using a cause-and-effect diagram, it was verified that machines, labor, method, and material are the main causes for the high setup time. The initial SMED action plan defined eleven actions to reduce the line setup time. The implementation of the SMED method resulted in a 64% reduction in setup time, bringing significant productivity and efficiency improvements to the analyzed SMT line.

Description

Keywords

SMED, SMT, Lean Manufacturing, Tempo de Setup, Eficiência Produtiva

Citation

DANTAS, Jorginaldo Dibo; LIMA, Alexandra Amaro de. Implementation of SMED Methodology to Reduce the Setup Time in a SMT Production Line. IOSR Journal of Business and Management, v. 25, n. 3, p. 60-78, mar. 2023. DOI: 10.9790/487X-2503036078.

Collections

Endorsement

Review

Supplemented By

Referenced By