Implementation of SMED Methodology to Reduce the Setup Time in a SMT Production Line
Arquivos
Data
2023
Título da Revista
ISSN da Revista
Título de Volume
Editor
Instituto de Tecnologia e Educação Galileo da Amazônia
Resumo
The overall objective is to implement the Single Minute Exchange of Die (SMED) methodology to reduce the setup time (model change) in an electronics factory in Brazil. The research was carried out at a company in the electronics segment, located in the Industrial Pole of Manaus (PIM). Using a cause-and-effect diagram, it was verified that machines, labor, method, and material are the main causes for the high setup time. The initial SMED action plan defined eleven actions to reduce the line setup time. The implementation of the SMED method resulted in a 64% reduction in setup time, bringing significant productivity and efficiency improvements to the analyzed SMT line.
Descrição
Palavras-chave
SMED, SMT, Lean Manufacturing, Tempo de Setup, Eficiência Produtiva
Citação
DANTAS, Jorginaldo Dibo; LIMA, Alexandra Amaro de. Implementation of SMED Methodology to Reduce the Setup Time in a SMT Production Line. IOSR Journal of Business and Management, v. 25, n. 3, p. 60-78, mar. 2023. DOI: 10.9790/487X-2503036078.