(Instituto de Tecnologia, 2017) LIMA, Francisco Lúcio Pinto de; MACÊDO, Emanuel Negrão
The study examines the use of the Production Project in the sealing masonry subsystem of vertical buildings, aiming to reduce costs and improve quality. The research shows that adopting this project can reduce costs by up to 25%, optimize execution time, minimize material waste, standardize processes, and increase productivity.