This study presents a procedure to reduce setup time in 800-ton injection molding machines at a company in the Manaus Industrial Hub, using the SMED (Single-Minute Exchange of Dies) method. The research shows that reducing setup time to less than 15 minutes, combined with a continuous improvement system, led to financial gains exceeding R$ 200,000.00, along with improvements in productivity, quality, and safety.